2017

  • Design, delivery, installation and commissioning of electrical part on a turnkey basis for K1, K2 and K3 boilers Flue Gas Desulphurisation Plant in International Paper Kwidzyn facilities;
  • Dismantling and installation of circulation pipelines, installation of flue gas duct and drain piping in PCC Rokita S.A. Combined Heat & Power Plant;
  • Delivery and installation of complete circulation piping combined with delivery of expansion joints, sieves, sprinkling levels and oxidation air lances in within a framework of J910 project – Construction of 910 MW power-generating unit in Jaworzno III Power Plant – Power Plant II;
  • Mechanical assembly of internal equipment of the absorber the wet method Flue Gas Desulphurisation Plant for power-generating units no. 5 and 6 in Opole Power Plant;
  • Installation of steel piping and plastic process piping for power-generating units no. 5 and 6 in Opole Power Plant.

2016

  • Installation of GRP process piping in EDF Rybnik Power Plant;
  • Turnkey delivery and installation of electrical part and I&C part of a bag filter for OFz-140 fluidised bed boiler;
  • Comprehensive execution of industrial flooring with drainage lines in Dalkia Poznań facilities;
  • Replacement of DN300 and DN50 steel piping for GRP in ZP Janikowo Ciech Soda Polska ;
  • Execution of concrete works in process buildings of power-generating units no. 5 and 6 in PGE Opole Power Plant;
  • Servicing of gypsum centrifugal separators in EDF Polska S.A.

2015

  • Installation of electricity on wet Flue Gas Desulphurisation (FGD) Gdańsk
  • Installation works with GRP Pipes with supports in wet FGD EDF Gdynia and Gdańsk
  • Electrical installation of centrifuges 5&6 in Bełchatów
  • Realization and delivery with turnkey installation and start-up electrical part and C&I of Bag Filter for Fluidised bed boiler Ofz-140 in SYNTHOS DWORY 7 Oświęcim
  • Refurbishment of electrofilter of steam boiler OPG-230 no. 1 in electrical installation in plant production NOWA in Dąbrowa Górnicza
  • Installation of lighting and jack repairs on electrofilter of boiler K1 in plant production NOWA in Dąbrowa Górnicza
  • Installation works with GRP Pipes and execution laminated connections – construction of wet FGD in Rybnik
  • Complex execution of industrial floors with drainage lines in Dalkia Poznań

2014

  • Refurbishment of the electrostatic precipitator (ESP) for the OPG 230 boiler No. 2 at the Generation Plant New Tauron – electric system with Automation and Control – for the TAURON HEAT (TAURON CIEPŁO) investor.
  • Refurbishment of the electrostatic precipitator (ESP) No. 11 – the civil engineering part of the project for the GIEK PGE BEŁCHATÓW investor.
  • Delivery and installation of the obstacle warning lighting system for the plant stack as well as the lightning system and overhauls sockets for the wet Flue Gas Desulphurization (FGD) System at:
    • EDF seashore, Heat and Power Generating Plant in Gdańsk (EC Gdańsk) for the EDF POLSKA investor.
    • EDF Seashore, Heat and Power Generating Plant in Gdańsk (EC Gdańsk) for the EDF POLSKA investor.
    • EDF Cracow for the EDF POLSKA investor.
    • EDF Wrocław for the EDF POLSKA investor.
  • Installation of equipment for the compressor station for needs of the wet Flue Gas Desulphurization (FGD) System at EDF Seashore, Heat and Power Generating Plant in Gdynia (EC Gdynia) for the EDF POLSKA investor.
  • Consortium of ECO-SOLUTION, Co. Ltd with KOMIN-PIEC-BUD – installation of a flue gas channel made of Glass-Reinforced Plastic (GRP) together with ladders, working platform and handrails for the wet Flue Gas Desulphurization (FGD) System at:
    • EDF Seashore, Heat and Power Generating Plant in Gdańsk (EC Gdańsk) for the EDF POLSKA investor
    • EDF Seashore, Heat and Power Generating Plant in Gdynia (EC Gdynia) for the EDF POLSKA investor
    • EDF Cracow for the EDF POLSKA investor.
    • EDF Wrocław for the EDF POLSKA investor.
  • Delivery and installation of the installation of electrical part and I&C part for 12 units of gypsum centrifuges for Flue Gas Desulphurisation method in PGE Bełchatów Power Plant – GIEK PGE investor;
  • Commissioning of 12 gypsum centrifugal separators for Flue Gas Desulphurisation method in PGE Bełchatów Power Plant – GIEK PGE investor.
  • Installation of technological equipment for the wet Flue Gas Desulphurization (FGD) System at EDF Seashore, Heat and Power Generating Plant in Gdynia (EC Gdynia) for the EDF POLSKA investor.

2013

  • Upgrade of Electrostatic Precipitator (ESP) for the power units No. 7 and 8 at the Electric Power Plant in Bełchatów.
  • Cladding of thermal insulation at the Electric Power Plant in Bełchatów
  • Cladding of thennal insulation at the Electric Power Plant in Kozienice
  • Upgrade of control cabinets for Electrostatic Precipitator (ESP) at the Electric Power Plant in Jaworzno
  • Installation of the electric power system for the Electrostatic Precipitator (ESP) for the power unit No. 8 at the Electric Power Plant in Kozienice
  • Design and erection of the power supply system for induced draught fans of isue gas for the power unit No. 8 at the Electric Power Plant in Kozienice
  • Cladding of thermal insulation at the Electric Power Plant in Jaworzno
  • Upgrade of the Flue Gas Desulphurization System for the power units No.5 and 6 at the Electric Power Plant in Bełchatów.
  • Design and erection of the electric power system of the K4 Electrostatic Precipitator (ESP) at the Thermal Power Plant `Nowa’.
  • Repair of sealings for the ash drainage system for the Electrostatic Precipitator (ESP) for power units No. 5 and 6 at the Electric Power Plant in Bełchatów.

2011/12

  • Electric installation jobs on the power unit No. 14 at the Electric Power Plant in Bełchatów
  • Upgrade of Electrostatic Precipitator (ESP) for the power unit No. 6 at the Electric Power Plant in Bełchatów
  • Electric installation jobs on the Electrostatic Precipitator (ESP) for the power unit No. 6 at the Electric Power Plant in Bełchatów
  • Overhaul of the electric switching station for the Electrostatic Precipitator (ESP) for the power unit No. 6 at the Electric Power Plant in Bełchatów
  • Erection of structural subassemblies at the Electric Power Plant in Jaworzno.
  • Fact, fabrication and installation of pipelines – the Bełchatów 2.1 Project.
  • Electric installation jobs at the Electric Power Plant in Jaworzno.
  • Design and erection of the power supply system for induced draught fans of flue gas for the power unit No. 4 at the Electric Power Plant in Kozienice.
  • Upgrade of control cabinets for Electrostatic Precipitator (ESP) at the Electric Power Plant in Kozienice
  • Erection and furnishing of the building for induced draught fans for the power unit No. 6 at the Electric Power Plant in Bełchatów.

2010

  • Upgrade of Electrostatic Precipitator (ESP) for the power unit No. 5 at the Electric Power Plant in Bełchatów
  • Electric installation jobs on the Electrostatic Precipitator (ESP) for the power unit No. 5 at the Electric Power Plant in Bełchatów
All rights reserved by Allset © 2017